WPCP Design/Build MCC Project

With the design phase nearly complete, BCI is now moving into the procurement and construction portion of work for this project the Design/Build MCC Replacement Phase 2 project ($1,020,000) for San Jose / Santa Clara Water Pollution Control Plant.

This entry was posted in Electrical. Bookmark the permalink.