BCI was recently awarded a $1.4 million dollar contract to replace several of the existing ventilation systems for the Harry Tracy WTP. The upgrades are part of a $174 million contract that was awarded to Kiewit Infrastructure West in February. The Harry Tracy WTP serves as the emergency back-up and supplementary water supply system for the entire San Francisco Peninsula. Local watershed runoff, along with water from Hetch Hetchy and East Bay sources, is stored in the reservoir system, then fed into the Harry Tracy Water Treatment Plant, and subsequently delivered to customers. The purpose of this project is to improve delivery reliability and provide seismic upgrades at this regional water treatment plant to achieve a sustained capacity of 140 million gallons per day (mgd) for at least 60 days, and to provide 140 mgd within 24 hours following a seismic event on the San Andreas Fault.
BCI Main Office
445 Boulder Ct.
Pleasanton, CA. 94566
Phone: (510) 657-3686
Fax: (510) 657-3688License and DIR
CSLB: 679326
DIR: 1000000447Certifications
Alameda County Transportation Commission LBE: BLO20170707-01
Categories
- Electrical (38)
- General Contracting (22)
- Mechanical (14)
-
Recent Posts
- New Main Office
- SFPUC Southeast WPCP Disinfection Upgrades
- BART Substation RRY Project
- EBMUD Rate Control Station Rehab
- Gilroy WWTP Preanoxic Basin Project
- SFPUC Groundwater Supply Well Stations
- SJWPCP Digester Gas Compressor Project
- BART Transformer Replacement Projects
- Folsom Dam Project Update
- San Jose Water Company – Vickery Tank Project
- BCI Featured in SMW Local 104 Fall Newsletter
- Emergency Ventilation Fans
- Rinconada WTP Residuals Management Project
- SFPUC San Antonio Pipeline (Sunol)
- Warm Springs tunnel ventilation
- VSFCD Influent Pump Station
- VTA Milpitas / Barryessa Extension Update
- VTA BRT Improvements nearing completion
- BART 19th Street Station Entrance Enclosure Pilot
- SSF WPCP Demolition Activities