BCI was recently awarded a $3.8 million dollar contract to upgrade the aging primary electrical, standby power, and PLC systems at the Rinconada WTP in Los Gatos, CA. Originally 4 separate projects, this larger, combined project allows BCI the ability to coordinate and execute work that involves all 4 aspects of of work simultaneously during limited shutdown windows. The work includes:
1. Replacement of reconfiguration of 12kV, 2.4kV, and 480V distribution switchgear, transformers, cabling, and conduits.
2. Replacement of various smaller “dowstream” UPS units with (4) New 50kVA “upstream” UPS units with Static Bypass Cabinets, Battery Cabinets, and associated conduit and wiring.
3. Reconfiguration of a 1500kW 480V Standby Generator and 480-12kV Step Up Transformer. This work includes various civil aspects, including concrete foundations, footings, construction of a sound wall, landscaping, as well as underground piping and electrical ductbanks.
4. Replacement of PLC cabinets with (N) centralized PLC control cabinets, along with associated “trunk” cabling between PLC cabinets and Remote I/O cabinets throughout the plant.
BCI Main Office
445 Boulder Ct.
Pleasanton, CA. 94566
Phone: (510) 657-3686
Fax: (510) 657-3688License and DIR
CSLB: 679326
DIR: 1000000447Certifications
Alameda County Transportation Commission LBE: BLO20170707-01
Categories
- Electrical (38)
- General Contracting (22)
- Mechanical (14)
-
Recent Posts
- New Main Office
- SFPUC Southeast WPCP Disinfection Upgrades
- BART Substation RRY Project
- EBMUD Rate Control Station Rehab
- Gilroy WWTP Preanoxic Basin Project
- SFPUC Groundwater Supply Well Stations
- SJWPCP Digester Gas Compressor Project
- BART Transformer Replacement Projects
- Folsom Dam Project Update
- San Jose Water Company – Vickery Tank Project
- BCI Featured in SMW Local 104 Fall Newsletter
- Emergency Ventilation Fans
- Rinconada WTP Residuals Management Project
- SFPUC San Antonio Pipeline (Sunol)
- Warm Springs tunnel ventilation
- VSFCD Influent Pump Station
- VTA Milpitas / Barryessa Extension Update
- VTA BRT Improvements nearing completion
- BART 19th Street Station Entrance Enclosure Pilot
- SSF WPCP Demolition Activities