Devil’s Slide Tunnel Update

Work continues on the Devil’s Slide Tunnel Project. Below are recent pictures showing the ventilation and supports in the equipment chamber, as well as some FRP ductwork being off-loaded and staged for installation for a fresh-air supply system.

 

This entry was posted in Mechanical. Bookmark the permalink.