Port of Oakland Shore Power Project

 

BCI was recently awarded the Shore Power Common Utility System Project at the Port of Oakland. This fast track, $1,000,000 project, involves installing 1000mcm 15kV Cabling, 12kV Switchgear, and electrical ductbanks to support future Shore-to-Ship power projects. Work is expected to be completed by Spring of 2012.

This entry was posted in Electrical, General Contracting. Bookmark the permalink.