BCI Main Office
445 Boulder Ct.
Pleasanton, CA. 94566
Phone: (510) 657-3686
Fax: (510) 657-3688License and DIR
CSLB: 679326
DIR: 1000000447Certifications
Alameda County Transportation Commission LBE: BLO20170707-01
Categories
- Electrical (38)
- General Contracting (22)
- Mechanical (14)
-
Recent Posts
- New Main Office
- SFPUC Southeast WPCP Disinfection Upgrades
- BART Substation RRY Project
- EBMUD Rate Control Station Rehab
- Gilroy WWTP Preanoxic Basin Project
- SFPUC Groundwater Supply Well Stations
- SJWPCP Digester Gas Compressor Project
- BART Transformer Replacement Projects
- Folsom Dam Project Update
- San Jose Water Company – Vickery Tank Project
- BCI Featured in SMW Local 104 Fall Newsletter
- Emergency Ventilation Fans
- Rinconada WTP Residuals Management Project
- SFPUC San Antonio Pipeline (Sunol)
- Warm Springs tunnel ventilation
- VSFCD Influent Pump Station
- VTA Milpitas / Barryessa Extension Update
- VTA BRT Improvements nearing completion
- BART 19th Street Station Entrance Enclosure Pilot
- SSF WPCP Demolition Activities
Monthly Archives: March 2011
DWR Pumping Plant Control Systems Rehab
BCI was recently awarded a $5 million+ project with the Department of Water Resources to rehabilitate (3) pumping plants along the Sutter Bypass Canal and East Borrow Canal, located near Yuba City, CA. Work includes the installation of (E) 12kV Switchgear Lineups, … Continue reading
Posted in General Contracting
Comments Off on DWR Pumping Plant Control Systems Rehab
USD Boyce Road Lift Station
BCI was recently awarded a contract with GSE Construction, for the electrical and instrumentation work associated with the renovation of Boyce Road Lift Station. The (E) lift station will remain in operation, continuously receiving and treating sewage, duration construction. An entirely … Continue reading
Posted in Electrical
Comments Off on USD Boyce Road Lift Station
Los Vaqueros Dam Expansion Project
BCI was recently awarded a contract to provide and install the new electrical systems, seismic instrumentation, and analytical instrumentation systems for the Los Vaqueros Dam Expansion Project. This contract worth $1.3 million is a fast track project, expected to be … Continue reading
Posted in Electrical
Leave a comment
WPCP Design/Build MCC Project
With the design phase nearly complete, BCI is now moving into the procurement and construction portion of work for this project the Design/Build MCC Replacement Phase 2 project ($1,020,000) for San Jose / Santa Clara Water Pollution Control Plant.
Posted in Electrical
Comments Off on WPCP Design/Build MCC Project
Oakmead Pump Station Engine Replacement
In 2010, BCI was awarded a $798,000 contract for the Oakmead Engine Replacement Project, in which (2) 1000HP direct drive engines are being replaced for the Oakmead Stormwater Pump Station in San Jose, CA. Work also includes replacement of a … Continue reading
Posted in General Contracting
Comments Off on Oakmead Pump Station Engine Replacement