Notice to Proceed has been issued on the SJSU Central Plant Improvement Project. Work includes electrical & controls to support the replacement of (2) 1,200 ton chillers, (2) 75HP and (2) 40HP chilled water pumps & VFDs, (2) 200HP condenser water pumps & VFD’s, (2) 200HP cooling tower fan VFD’s. Electrical work involves installation of 5kV distribution & transformers, 480V power distribution systems, as well as 120V power and controls. This project also involves replacement of the entire HVAC-grade facility control system with a more robust industrial-grade PLC-type facility control system. This new system will allow for more advanced control strategies. The existing controls system will be replaced with the new PLC based system while the plant remains operational and in service. Work is expected to be complete by Summer of 2012.
BCI Main Office
445 Boulder Ct.
Pleasanton, CA. 94566
Phone: (510) 657-3686
Fax: (510) 657-3688License and DIR
CSLB: 679326
DIR: 1000000447Certifications
Alameda County Transportation Commission LBE: BLO20170707-01
Categories
- Electrical (38)
- General Contracting (22)
- Mechanical (14)
-
Recent Posts
- New Main Office
- SFPUC Southeast WPCP Disinfection Upgrades
- BART Substation RRY Project
- EBMUD Rate Control Station Rehab
- Gilroy WWTP Preanoxic Basin Project
- SFPUC Groundwater Supply Well Stations
- SJWPCP Digester Gas Compressor Project
- BART Transformer Replacement Projects
- Folsom Dam Project Update
- San Jose Water Company – Vickery Tank Project
- BCI Featured in SMW Local 104 Fall Newsletter
- Emergency Ventilation Fans
- Rinconada WTP Residuals Management Project
- SFPUC San Antonio Pipeline (Sunol)
- Warm Springs tunnel ventilation
- VSFCD Influent Pump Station
- VTA Milpitas / Barryessa Extension Update
- VTA BRT Improvements nearing completion
- BART 19th Street Station Entrance Enclosure Pilot
- SSF WPCP Demolition Activities