BCI Main Office
445 Boulder Ct.
Pleasanton, CA. 94566
Phone: (510) 657-3686
Fax: (510) 657-3688License and DIR
CSLB: 679326
DIR: 1000000447Certifications
Alameda County Transportation Commission LBE: BLO20170707-01
Categories
- Electrical (38)
- General Contracting (22)
- Mechanical (14)
-
Recent Posts
- New Main Office
- SFPUC Southeast WPCP Disinfection Upgrades
- BART Substation RRY Project
- EBMUD Rate Control Station Rehab
- Gilroy WWTP Preanoxic Basin Project
- SFPUC Groundwater Supply Well Stations
- SJWPCP Digester Gas Compressor Project
- BART Transformer Replacement Projects
- Folsom Dam Project Update
- San Jose Water Company – Vickery Tank Project
- BCI Featured in SMW Local 104 Fall Newsletter
- Emergency Ventilation Fans
- Rinconada WTP Residuals Management Project
- SFPUC San Antonio Pipeline (Sunol)
- Warm Springs tunnel ventilation
- VSFCD Influent Pump Station
- VTA Milpitas / Barryessa Extension Update
- VTA BRT Improvements nearing completion
- BART 19th Street Station Entrance Enclosure Pilot
- SSF WPCP Demolition Activities
Author Archives: Blocka Construction, Inc.
BCI Featured in SMW Local 104 Fall Newsletter
BCI is proud to announce that Sheetmetal Local 104 featured the Warm Springs BART Extension Project in their Fall 2015 newsletter. Please see link below for the article.
Posted in Mechanical
Comments Off on BCI Featured in SMW Local 104 Fall Newsletter
Emergency Ventilation Fans
Installation Day for the Emergency Ventilation Fans for the BART Warm Springs Extension Project.
Posted in Mechanical
Comments Off on Emergency Ventilation Fans
Rinconada WTP Residuals Management Project
Below are some updated progress pictures of the Centrifuge Building, Gravity Thickeners, and Solids Loadout area. Also shown is the 12kV substation BCI installed to support these new facilities. Work is expected to be complete in late 2015.
Posted in Electrical
Comments Off on Rinconada WTP Residuals Management Project
SFPUC San Antonio Pipeline (Sunol)
The objective of this project was to install approximately 6,600 feet of 66-inch diameter of welded steel pipe located along the west side of Calaveras Road from the Alameda Siphons on the south to the edge of the SMP-24 quarry … Continue reading
Posted in Electrical
Comments Off on SFPUC San Antonio Pipeline (Sunol)
Warm Springs tunnel ventilation
The BART Warm Springs Extension project features 2 ventilation structures that provide tunnel ventilation for the BART ROW underneath Lake Elizabeth in Fremont. Below is a photo from one of the ventilation structures featuring 2 parallel sections of 14′ x … Continue reading
Posted in Mechanical
Comments Off on Warm Springs tunnel ventilation
VSFCD Influent Pump Station
This project was completed in late 2014 and included installation of cable trays and VFD rated cabling to the influent pumps at the Vallejo Sanitation Flood Control District.
Posted in Electrical
Comments Off on VSFCD Influent Pump Station
VTA Milpitas / Barryessa Extension Update
Aerial photos of the latest work at the Milpitas Station.
Posted in Mechanical
Comments Off on VTA Milpitas / Barryessa Extension Update
VTA BRT Improvements nearing completion
This project is nearing completion. Below are recent pictures of the installation of the work platforms that will facilitate the new buses VTA is placing into operation.
Posted in General Contracting
Comments Off on VTA BRT Improvements nearing completion
BART 19th Street Station Entrance Enclosure Pilot
BCI was recently awarded the BART 19th Station Entrance Enclosure Project. The goal of this pilot project is to create a context sensitive entrance that enhance users’ comfort and safety while improving station security. The station enclosure involves features such … Continue reading
Posted in General Contracting
Comments Off on BART 19th Street Station Entrance Enclosure Pilot
SSF WPCP Demolition Activities
With temporary switchgear and feeders in place, demolition of the existing building, equipment and generators was able to proceed. Below is a photo highlighting the removal of the existing generator lineup.
Posted in Electrical, General Contracting
Comments Off on SSF WPCP Demolition Activities