Author Archives: Blocka Construction, Inc.

BCI Featured in SMW Local 104 Fall Newsletter

BCI is proud to announce that Sheetmetal Local 104 featured the Warm Springs BART Extension Project in their Fall 2015 newsletter. Please see link below for the article.

Posted in Mechanical | Comments Off on BCI Featured in SMW Local 104 Fall Newsletter

Emergency Ventilation Fans

Installation Day for the Emergency Ventilation Fans for the BART Warm Springs Extension Project.  

Posted in Mechanical | Comments Off on Emergency Ventilation Fans

Rinconada WTP Residuals Management Project

Below are some updated progress pictures of the Centrifuge Building, Gravity Thickeners, and Solids Loadout area. Also shown is the 12kV substation BCI installed to support these new facilities. Work is expected to be complete in late 2015.    

Posted in Electrical | Comments Off on Rinconada WTP Residuals Management Project

SFPUC San Antonio Pipeline (Sunol)

The objective of this project was to install approximately 6,600 feet of 66-inch diameter of welded steel pipe located along the west side of Calaveras Road from the Alameda Siphons on the south to the edge of the SMP-24 quarry … Continue reading

Posted in Electrical | Comments Off on SFPUC San Antonio Pipeline (Sunol)

Warm Springs tunnel ventilation

The BART Warm Springs Extension project features 2 ventilation structures that provide tunnel ventilation for the BART ROW underneath Lake Elizabeth in Fremont. Below is a photo from one of the ventilation structures featuring 2 parallel sections of 14′ x … Continue reading

Posted in Mechanical | Comments Off on Warm Springs tunnel ventilation

VSFCD Influent Pump Station

This project was completed in late 2014 and included installation of cable trays and VFD rated cabling to the influent pumps at the Vallejo Sanitation Flood Control District.

Posted in Electrical | Comments Off on VSFCD Influent Pump Station

VTA Milpitas / Barryessa Extension Update

Aerial photos of the latest work at the Milpitas Station.

Posted in Mechanical | Comments Off on VTA Milpitas / Barryessa Extension Update

VTA BRT Improvements nearing completion

This project is nearing completion. Below are recent pictures of the installation of the work platforms that will facilitate the new buses VTA is placing into operation.

Posted in General Contracting | Comments Off on VTA BRT Improvements nearing completion

BART 19th Street Station Entrance Enclosure Pilot

BCI was recently awarded the BART 19th Station Entrance Enclosure Project. The goal of this pilot project is to create a context sensitive entrance that enhance users’ comfort and safety while improving station security. The station enclosure involves features such … Continue reading

Posted in General Contracting | Comments Off on BART 19th Street Station Entrance Enclosure Pilot

SSF WPCP Demolition Activities

With temporary switchgear and feeders in place, demolition of the existing building, equipment and generators was able to proceed. Below is a photo highlighting the removal of the existing generator lineup.

Posted in Electrical, General Contracting | Comments Off on SSF WPCP Demolition Activities