- New Main Office
- SFPUC Southeast WPCP Disinfection Upgrades
- BART Substation RRY Project
- EBMUD Rate Control Station Rehab
- Gilroy WWTP Preanoxic Basin Project
- SFPUC Groundwater Supply Well Stations
- SJWPCP Digester Gas Compressor Project
- BART Transformer Replacement Projects
- Folsom Dam Project Update
- San Jose Water Company – Vickery Tank Project
- BCI Featured in SMW Local 104 Fall Newsletter
- Emergency Ventilation Fans
- Rinconada WTP Residuals Management Project
- SFPUC San Antonio Pipeline (Sunol)
- Warm Springs tunnel ventilation
- VSFCD Influent Pump Station
- VTA Milpitas / Barryessa Extension Update
- VTA BRT Improvements nearing completion
- BART 19th Street Station Entrance Enclosure Pilot
- SSF WPCP Demolition Activities
Author Archives: Blocka Construction, Inc.
BART Warm Springs Extension
BCI is partnered with Warm Springs Constructors for the HVAC portion of this project, which will add 5.4-miles of new tracks from the existing Fremont Station south to a new station in the Warm Springs district of the City of … Continue reading
Posted in Mechanical
Comments Off on BART Warm Springs Extension
Rinconada WTP Update
Below are two progress pictures showing the work inside the existing substation, as well as new ductbank and foundation work for the new standby generator that will be installed shortly. This work is in preparation for a 96-hour plant-wide shutdown in December, … Continue reading
Posted in Electrical, General Contracting
Comments Off on Rinconada WTP Update
Los Vaqueros Reservoir Aerial Photo
Below is an aerial photo of the latest construction activities at Los Vaqueros Reservoir.
Posted in Electrical
Comments Off on Los Vaqueros Reservoir Aerial Photo
NTP issued for Backwash Pump VFD Replacement
BCI has received Notice to Proceed for the replacement of (2) Backwash Pump Variable Frequency Drives at the Monterey Regional Water Pollution Control Agency. Work includes includes demolition of the existing drives, reconfiguration of the (E) housekeeping pads, installation of … Continue reading
Posted in Electrical, General Contracting
Comments Off on NTP issued for Backwash Pump VFD Replacement
Los Vaqueros Dam Update
Work continues 24/7 on the expansion of Los Vaqueros Dam. Electrical work on the new intake structure will be starting next week.
Posted in Electrical
Comments Off on Los Vaqueros Dam Update
Las Gallinas Recycled Water Facility
BCI was recently awarded the $1,500,000+ electrical and instrumentation contract for the Las Gallinas Valley Sanitary District – Recycled Water Facility Project. This project includes installation of membrane filter and UV disinfection equipment, adding recycled water facility feed pumps in … Continue reading
Posted in Electrical
Comments Off on Las Gallinas Recycled Water Facility
VTA Kato Road Grade Seperation
Notice to Proceed has been issued for the Kato Road Grade Separation Project. This project will separate Kato Road from the active freight rail corridor currently owned by Santa Clara Valley Transportation Authority (VTA). When complete, Kato Road will run depressed underneath the rail … Continue reading
Posted in Electrical
Comments Off on VTA Kato Road Grade Seperation
SJSU – Central Plant Improvement
Notice to Proceed has been issued on the SJSU Central Plant Improvement Project. Work includes electrical & controls to support the replacement of (2) 1,200 ton chillers, (2) 75HP and (2) 40HP chilled water pumps & VFDs, (2) 200HP condenser water pumps … Continue reading
Posted in Electrical
Comments Off on SJSU – Central Plant Improvement
Port of Oakland Shore Power Project
BCI was recently awarded the Shore Power Common Utility System Project at the Port of Oakland. This fast track, $1,000,000 project, involves installing 1000mcm 15kV Cabling, 12kV Switchgear, and electrical ductbanks to support future Shore-to-Ship power projects. Work is … Continue reading
Posted in Electrical, General Contracting
Comments Off on Port of Oakland Shore Power Project
Berger II ISD Data Center HVAC Project
Work is underway on the HVAC upgrades for the Berger II ISD Data Center Project. This work includes replacing equipment, ductwork, and controls to support the cooling needs of new emergency power and UPS equipment.
Posted in Mechanical