BCI awarded Soulajule Pump Station Project

BCI was recently awarded the Soulajule Pump Station Diesel Engine Replacement Project for Marin Municipal Water District. This contract includes removal of two 930 BHP diesel engines and provision of two new 800 HP electrical motors connecting to existing centrifugal water pumps; modification of two existing centrifugal water pumps, exhaust systems, (2) 480V motor control centers, generator tap box, fuel piping modifications, and an 800kw rental generator for functional testing. Work is expected to be completed by summer of 2013.

This entry was posted in Electrical, General Contracting. Bookmark the permalink.