BCI Main Office
445 Boulder Ct.
Pleasanton, CA. 94566
Phone: (510) 657-3686
Fax: (510) 657-3688License and DIR
CSLB: 679326
DIR: 1000000447Certifications
Alameda County Transportation Commission LBE: BLO20170707-01
Categories
- Electrical (38)
- General Contracting (22)
- Mechanical (14)
-
Recent Posts
- New Main Office
- SFPUC Southeast WPCP Disinfection Upgrades
- BART Substation RRY Project
- EBMUD Rate Control Station Rehab
- Gilroy WWTP Preanoxic Basin Project
- SFPUC Groundwater Supply Well Stations
- SJWPCP Digester Gas Compressor Project
- BART Transformer Replacement Projects
- Folsom Dam Project Update
- San Jose Water Company – Vickery Tank Project
- BCI Featured in SMW Local 104 Fall Newsletter
- Emergency Ventilation Fans
- Rinconada WTP Residuals Management Project
- SFPUC San Antonio Pipeline (Sunol)
- Warm Springs tunnel ventilation
- VSFCD Influent Pump Station
- VTA Milpitas / Barryessa Extension Update
- VTA BRT Improvements nearing completion
- BART 19th Street Station Entrance Enclosure Pilot
- SSF WPCP Demolition Activities
Category Archives: Electrical
SFPUC San Antonio Pipeline (Sunol)
The objective of this project was to install approximately 6,600 feet of 66-inch diameter of welded steel pipe located along the west side of Calaveras Road from the Alameda Siphons on the south to the edge of the SMP-24 quarry … Continue reading
Posted in Electrical
Comments Off on SFPUC San Antonio Pipeline (Sunol)
VSFCD Influent Pump Station
This project was completed in late 2014 and included installation of cable trays and VFD rated cabling to the influent pumps at the Vallejo Sanitation Flood Control District.
Posted in Electrical
Comments Off on VSFCD Influent Pump Station
SSF WPCP Demolition Activities
With temporary switchgear and feeders in place, demolition of the existing building, equipment and generators was able to proceed. Below is a photo highlighting the removal of the existing generator lineup.
Posted in Electrical, General Contracting
Comments Off on SSF WPCP Demolition Activities
ACWD LOX Conversion Project
BCI was recently selected to perform the electrical and instrumentation upgrades associated with the LOX Conversion and Process Upgrades project for ACWD. The electrical and instrumentation portions of work will support the installation of a liquid oxygen storage tank, vaporizers, … Continue reading
SFPUC San Antonio Pipeline Project
Preliminary construction activities are underway on the SFPUC San Antonio Pipeline Project, which includes installation 6,600′ of 66″ welded steel pipeline, control structures, chemical facilities, discharge structures, and other various facilities. BCI’s scope of work includes electrical, instrumentation, and control … Continue reading
Posted in Electrical, Mechanical
Comments Off on SFPUC San Antonio Pipeline Project
Standby Generator and Bus Duct Replacement Project
BCI was recently awarded a contract for electrical and standby power improvements at the South San Francisco / San Bruno Water Quality Control Plant. This project consists of demolition of an existing standby generator building, construction of a new pile-supported … Continue reading
Posted in Electrical, General Contracting
Comments Off on Standby Generator and Bus Duct Replacement Project
MUNI Integrated Systems Replacement Project
On January 15th, SFMTA Board of Directors approved a recommendation to award the MUNI Integrated Systems Replacement Project to BCI. The scope of this project includes replacing and installing the Subway Public Address/Platform Display System (PA/PDS), the Subway Facility SCADA system, … Continue reading
Posted in Electrical, General Contracting, Mechanical
Comments Off on MUNI Integrated Systems Replacement Project
NTP received on Sunnyvale Water Plant Reconstruction
BCI has received a Notice to Proceed for reconstruction work of the Sunnyvale Wright Avenue Water Plant. Work includes replacement of (3) 90HP LPG engine-driven emergency pumps, replacement of pump station roof and structural components, replacement of the main switchboard, … Continue reading
Posted in Electrical, General Contracting
Comments Off on NTP received on Sunnyvale Water Plant Reconstruction
BART Fire Alarm Renovation – M-Line
BCI was recently awarded a contract to replace existing fire alarm systems at (7) BART stations located throughout San Francisco and Daly City with new detection and alarm systems. Work on this project is expected to be completed by April … Continue reading
Posted in Electrical
Comments Off on BART Fire Alarm Renovation – M-Line
BCI awarded Soulajule Pump Station Project
BCI was recently awarded the Soulajule Pump Station Diesel Engine Replacement Project for Marin Municipal Water District. This contract includes removal of two 930 BHP diesel engines and provision of two new 800 HP electrical motors connecting to existing centrifugal … Continue reading
Posted in Electrical, General Contracting
Comments Off on BCI awarded Soulajule Pump Station Project