BCI Main Office
445 Boulder Ct.
Pleasanton, CA. 94566
Phone: (510) 657-3686
Fax: (510) 657-3688License and DIR
CSLB: 679326
DIR: 1000000447Certifications
Alameda County Transportation Commission LBE: BLO20170707-01
Categories
- Electrical (38)
- General Contracting (22)
- Mechanical (14)
-
Recent Posts
- New Main Office
- SFPUC Southeast WPCP Disinfection Upgrades
- BART Substation RRY Project
- EBMUD Rate Control Station Rehab
- Gilroy WWTP Preanoxic Basin Project
- SFPUC Groundwater Supply Well Stations
- SJWPCP Digester Gas Compressor Project
- BART Transformer Replacement Projects
- Folsom Dam Project Update
- San Jose Water Company – Vickery Tank Project
- BCI Featured in SMW Local 104 Fall Newsletter
- Emergency Ventilation Fans
- Rinconada WTP Residuals Management Project
- SFPUC San Antonio Pipeline (Sunol)
- Warm Springs tunnel ventilation
- VSFCD Influent Pump Station
- VTA Milpitas / Barryessa Extension Update
- VTA BRT Improvements nearing completion
- BART 19th Street Station Entrance Enclosure Pilot
- SSF WPCP Demolition Activities
Category Archives: General Contracting
NTP received for BART Site Hardening Project
BCI recently received a NTP from Bay Area Rapid Transit for the Site Hardening of 3 Stations – Civic Center Station (SF), Downtown Berkeley, and 19th Street (Oakland). This $2.7 million contract will include installation of various hardening devices and … Continue reading
Posted in Electrical, General Contracting
Comments Off on NTP received for BART Site Hardening Project
Rinconada WTP Generator Installation
Below are some pictures from a recent Generator and Fuel Tank installation at the SCVWD Rinconada WTP in Los Gatos, CA. This unique installation involved separating a 2000KW Diesel Powered Portable Generator from its trailer assembly and installing the Genset as a permanent unit … Continue reading
Posted in Electrical, General Contracting
Comments Off on Rinconada WTP Generator Installation
Oakmead Pump Station Update
Below are some pictures showing the removal of (2) 1000HP engines at the Oakmead Stormwater Pump Station in San Jose, CA.
Posted in General Contracting
Comments Off on Oakmead Pump Station Update
Rinconada WTP Update
Below are two progress pictures showing the work inside the existing substation, as well as new ductbank and foundation work for the new standby generator that will be installed shortly. This work is in preparation for a 96-hour plant-wide shutdown in December, … Continue reading
Posted in Electrical, General Contracting
Comments Off on Rinconada WTP Update
NTP issued for Backwash Pump VFD Replacement
BCI has received Notice to Proceed for the replacement of (2) Backwash Pump Variable Frequency Drives at the Monterey Regional Water Pollution Control Agency. Work includes includes demolition of the existing drives, reconfiguration of the (E) housekeeping pads, installation of … Continue reading
Posted in Electrical, General Contracting
Comments Off on NTP issued for Backwash Pump VFD Replacement
Port of Oakland Shore Power Project
BCI was recently awarded the Shore Power Common Utility System Project at the Port of Oakland. This fast track, $1,000,000 project, involves installing 1000mcm 15kV Cabling, 12kV Switchgear, and electrical ductbanks to support future Shore-to-Ship power projects. Work is … Continue reading
Posted in Electrical, General Contracting
Comments Off on Port of Oakland Shore Power Project
BCI awarded Oakmead Phase III Project
The third and final phase of the Oakmead Engine Replacement project was recently awarded to BCI. This $650,000 project will replace the final 2 engines at the Oakmead Storm Pump Station. Below are before and after pictures of an engine … Continue reading
Posted in Electrical, General Contracting, Mechanical
Comments Off on BCI awarded Oakmead Phase III Project
BART 480V Switchgear Replacement Phase II
This $6,000,000+ project includes replacement of aging electrical distribution panels and switchgear at 18 BART stations throughout Alameda and Contra Costa counties. Work includes de-energizing power to each station, which is only allowed during non-revenue hours. With work at 15 stations … Continue reading
Posted in Electrical, General Contracting
Comments Off on BART 480V Switchgear Replacement Phase II
BART 34.5kV Cable Upgrade
Work is now fully underway on the BART 34.5kv Cable Replacement project. This contract, in excess of $9,000,000, is the first phase of a series of projects planned for the replacement of aging power cables throughout the entire BART system. Work … Continue reading
Posted in Electrical, General Contracting
Comments Off on BART 34.5kV Cable Upgrade
Rinconada WTP Electrical Upgrades
BCI was recently awarded a $3.8 million dollar contract to upgrade the aging primary electrical, standby power, and PLC systems at the Rinconada WTP in Los Gatos, CA. Originally 4 separate projects, this larger, combined project allows BCI the ability to coordinate … Continue reading
Posted in Electrical, General Contracting
Comments Off on Rinconada WTP Electrical Upgrades