BCI Main Office
445 Boulder Ct.
Pleasanton, CA. 94566
Phone: (510) 657-3686
Fax: (510) 657-3688License and DIR
CSLB: 679326
DIR: 1000000447Certifications
Alameda County Transportation Commission LBE: BLO20170707-01
Categories
- Electrical (38)
- General Contracting (22)
- Mechanical (14)
-
Recent Posts
- New Main Office
- SFPUC Southeast WPCP Disinfection Upgrades
- BART Substation RRY Project
- EBMUD Rate Control Station Rehab
- Gilroy WWTP Preanoxic Basin Project
- SFPUC Groundwater Supply Well Stations
- SJWPCP Digester Gas Compressor Project
- BART Transformer Replacement Projects
- Folsom Dam Project Update
- San Jose Water Company – Vickery Tank Project
- BCI Featured in SMW Local 104 Fall Newsletter
- Emergency Ventilation Fans
- Rinconada WTP Residuals Management Project
- SFPUC San Antonio Pipeline (Sunol)
- Warm Springs tunnel ventilation
- VSFCD Influent Pump Station
- VTA Milpitas / Barryessa Extension Update
- VTA BRT Improvements nearing completion
- BART 19th Street Station Entrance Enclosure Pilot
- SSF WPCP Demolition Activities
Category Archives: Mechanical
Berger II ISD Data Center HVAC Project
Work is underway on the HVAC upgrades for the Berger II ISD Data Center Project. This work includes replacing equipment, ductwork, and controls to support the cooling needs of new emergency power and UPS equipment.
Posted in Mechanical
Comments Off on Berger II ISD Data Center HVAC Project
BCI awarded Oakmead Phase III Project
The third and final phase of the Oakmead Engine Replacement project was recently awarded to BCI. This $650,000 project will replace the final 2 engines at the Oakmead Storm Pump Station. Below are before and after pictures of an engine … Continue reading
Posted in Electrical, General Contracting, Mechanical
Comments Off on BCI awarded Oakmead Phase III Project
Devil’s Slide Tunnel Update
Work continues on the Devil’s Slide Tunnel Project. Below are recent pictures showing the ventilation and supports in the equipment chamber, as well as some FRP ductwork being off-loaded and staged for installation for a fresh-air supply system.
Posted in Mechanical
Comments Off on Devil’s Slide Tunnel Update
Harry Tracy WTP Long Term Improvements
BCI was recently awarded a $1.4 million dollar contract to replace several of the existing ventilation systems for the Harry Tracy WTP. The upgrades are part of a $174 million contract that was awarded to Kiewit Infrastructure West in February. The … Continue reading
Posted in Mechanical
Comments Off on Harry Tracy WTP Long Term Improvements